Industrial, Manufacturing & Operational Systems
epub, pdf |eng | | Author:Enrique Hortal

References 1. Galán F, Nuttin M, Lew E, Ferrez PW, Vanacker G, Philips J, Millán JDR (2008) A Brain-actuated wheelchair: asynchronous and non-invasive Brain–Computer Interface for continous control of robots. ...
( Category: Biomedical Engineering July 26,2020 )
epub |eng | 2014-11-20 | Author:Yusen L. Xia & Walter L. Wallace [Yusen L. Xia]

Map Your Supply Chain Many companies do not have a comprehensive understanding of the sustainability impacts of their supply chain. An early step is to inventory suppliers, identify the most ...
( Category: Production, Operation & Management July 25,2020 )
epub |eng | 2020-07-21 | Author:Thomas Gryta & Ted Mann [Gryta, Thomas & Mann, Ted]

28 Cowboys into Farmers AS GE COURTED new media attention and sought the public adoration it so envied in the startup economy of Silicon Valley, real life didn’t get any ...
( Category: Manufacturing July 24,2020 )
epub |eng | 2020-07-20 | Author:Thomas Gryta

28 Cowboys into Farmers AS GE COURTED new media attention and sought the public adoration it so envied in the startup economy of Silicon Valley, real life didn’t get any ...
( Category: Manufacturing July 24,2020 )
epub |fra | 2014-11-09 | Author:Kimmo Karvinen,Tero Karvinen [Kimmo Karvinen,Tero Karvinen]

Conclusion You have learned to write Arduino programs and measure the world. Your Arduino can sense pressure, temperature, light, and many other things. If you want to keep working with ...
( Category: Robotics & Automation July 23,2020 )
epub |eng | 2015-08-14 | Author:Sam Siewert & John Pratt [Siewert, Sam & Pratt, John]

Exercises Create a user-defined interrupt handler for the timer ISR and a task for processing. The timer should be scheduled on a regular basis, and the interrupt handler should signal ...
( Category: Embedded Systems July 20,2020 )
epub |eng | 2015-04-16 | Author:Bernard S. Matisoff

Undercuts (Reliefs) Undercuts should be avoided unless absolutely necessary. They may be used only when thread runout on external and internal applications cannot be tolerated due to space limitations. External ...
( Category: Electronics July 10,2020 )
azw3 |eng | 2016-12-13 | Author:Adrian Kaehler & Gary Bradski [Kaehler, Adrian]

Figure 16-16. The point P is a keypoint candidate for the FAST algorithm. The ring of points that contribute to the classification of P are identified by a circle around ...
( Category: DSPs July 10,2020 )
epub |eng | | Author:Karl H. E. Kroemer & Hiltrud J. Kroemer & Katrin E. Kroemer-Elbert

As discussed in Chaps. 2 and 3, a signal traveling from a nerve causes a muscle twitch (contraction). A twitch consists of four periods, as described in Table 7.2. The ...
( Category: Biomedical Engineering July 10,2020 )
epub |eng | 2020-05-19 | Author:Caldwell, Greg [Caldwell, Greg]

It is Heavily Dependent on Quick Decision Making Due to the adaptive nature of the method, Agile Project Management requires leaders that are quick to think of their feet. This ...
( Category: Quality Control July 8,2020 )
epub |eng | 2020-07-15 | Author:David L. Olson

Table 4.14 Model results Range Occurrences Probability PERT probability Below 10 weeks 0 0.00 0.03 Between 10 and 10.5 weeks 2 0.02 0.06 Between 10.5 and 11 weeks 2 0.02 ...
epub |eng | | Author:Jude Mary Runge

4.4 Microstructural Development in Wrought Aluminum Alloys Wrought alloys are designed to be deformed and therefore must possess a minimum ductility commensurate with the manufacturing process under consideration for engineering ...
( Category: Electricity July 7,2020 )
azw3 |eng | 2020-06-25 | Author:Yasuhiro Monden [Monden, Yasuhiro]

14 Cross-Functional Management to Promote Company-Wide Quality Assurance and Cost Management § 1 INTRODUCTION As described in Chapter 13, CWQC is possible only if quality control activities and quality-related functions ...
( Category: Industrial Design July 7,2020 )
azw3 |eng | 2016-12-31 | Author:Itay Abuhav

220 ISO 9001:2015—A Complete Guide to Quality Management Systems 8.2.3 Review of Requirements for Products and Services After determining the requirements for the product or the service, the organization is ...
( Category: Health & Safety July 7,2020 )
epub |eng | 2009-07-14 | Author:J. Rodney Turner

10.3 ASSESSING RISK Having identified possible sources of risk to the project, we need to determine their impact. First, we assess the impact of individual risks through qualitative assessment. On ...
( Category: Management July 5,2020 )